So yeah the excessive winds and rain show the risk of not having your roofer on hand to get shingles up right away. :)
At least the roofer is now installing the actual roofing material on the house. :)
So yeah the excessive winds and rain show the risk of not having your roofer on hand to get shingles up right away. :)
At least the roofer is now installing the actual roofing material on the house. :)
The addition is "dried in". It all exists and its at least sealed from water (mostly) so that it can dry out before siding and roofing go on.
The new stairs are also all enclosed and the old stairs are no more. (last photo shows a new wall over the old stairs opening)
Guest bath framing and rough in done.
Master bath framing and rough in done.
Laundry room framing and rough in done.
Kids bath framing and rough in done.
Master is good to go now as well, again except for a few handles..... I ordered way short. It was a lot harder cutting those angled lines ...