Next to drywall this is one of the most labor intensive phases. It takes a ton of work to get clean trim in there. Far more than I thought. Next post will show more detail on how much work it takes to prep all that trim for painting.
Next to drywall this is one of the most labor intensive phases. It takes a ton of work to get clean trim in there. Far more than I thought. Next post will show more detail on how much work it takes to prep all that trim for painting.
Started on this part. Its mostly done now. Just have to bolt it to the concrete, finish handrails. I will get the trex material for the decking and stairs later, the plywood is temporary.
Garage door was finally installed. No more plasting ones. Its a belt drive and its pretty crazy how quiet it is .vs chain drives. I doubt you even hear it inside the house when it operates.
Flooring is all complete now. I am glad we decided to carry the wood through the kitchen. It looks pretty nice overall now.
Lots of progress on the walls and ceilings.
Painting has started. Entire house is now sprayed with primer, all ceilings are sprayed. Will start prepping trim now for painting which is a massive task.
Ever wonder how they paint those really tall stairwells? Apparently using this.
Short title, long post. :) LOTS of drywall work done. Probably like 60-70% of the house at the end of the day. Tons of patching with all the electrical re-wiring. Notice there are no downstairs drywall photos. Thats because contractor did upstairs drywall then started mudding. Then I started spraying primer and he moved downstairs and is doing the drywall and tape/mudding now.
Since we decided to replace DR floor I saved a few bucks on demo by doing it myself. Glad we did, there was old crystallized dog pee in multiple spots. :( i used a lot of enzyme cleaner on that stuff. I hope I can still re-use a good amount of the wood for some kind of later accent wall or something. Have to see how much is contaminated.
Here you can see the staining. Anything black is where the dog pee stained the paper under the HW flooring.
Lots of Fir flooring here from DR
This is Red Oak from the hallway, the mismatch of flooring types was probalby the thing that pushed us over the edge to replace these. We will keep the LR wood floor and refinish it.
Lots of behind the scenes stuff. Most of if was not very fun at all. Network wiring, I like hardwired cables for anything with video, so that means pulling CAT6. I also added insulation for sound to pretty much every interior wall that I could access. Sunk easily 100-150 screws into the upstairs subfloor to help with creaks as well. Contractor added laundry chute, I get to make it look nice inside the house later.
Laundry chute
Master is good to go now as well, again except for a few handles..... I ordered way short. It was a lot harder cutting those angled lines ...