Wednesday, May 3, 2023

#26 Master bedroom and closet

 Master is good to go now as well, again except for a few handles.....  I ordered way short.









It was a lot harder cutting those angled lines on the vaulted ceiling than I expected.  Very slow.  



Cabinets didnt fit around corener in hallway, so they got creative and used a ladder to bring them in the window.

Final product






#25 Master bath

 Master bath is done except for a few missing knobs and no toilet paper holder.








Tuesday, May 2, 2023

#24 Family room

 Lots of work to get floor "level ish"  level is a pipe dream.  :)  












#23 Guest bath

 The tile wall turned out nice in here.  Someon ordered waaaaaaay too much hex tileon the floor, we have like 4 boxes left.  no clue what I will do with it.







#22 kids bathroom

 Bathroom is pretty much done now








#21 Dining room and lower hall/laundry

 huge backlog of updates, so switching to room based.  dining room/hall first.



downstairs hallway






Laundry room.  We decied to re use the old butcher block from the kitchen as the counter here.  So it was sanded and then clear coated with commercial clearcoat and then use as countertop for sink.

In the shuffle we forgot to buy cabinets here  Had to scramble last minute to get them in time, but we got it installed.







#26 Master bedroom and closet

 Master is good to go now as well, again except for a few handles.....  I ordered way short. It was a lot harder cutting those angled lines ...