Short title, long post. :) LOTS of drywall work done. Probably like 60-70% of the house at the end of the day. Tons of patching with all the electrical re-wiring. Notice there are no downstairs drywall photos. Thats because contractor did upstairs drywall then started mudding. Then I started spraying primer and he moved downstairs and is doing the drywall and tape/mudding now.
Reminder what we are dealing with in the "old"areas of the house. Fiber board, with a layer or plaster over it, then a layer of drywall on top of that. Most of the 30-40% of drywall not redone is like this. Demo of this stuff sucked.