Sunday, March 5, 2023

#14 Drywall

 

Short title, long post.  :)  LOTS of drywall work done.  Probably like 60-70% of the house at the end of the day.  Tons of patching with all the electrical re-wiring.  Notice there are no downstairs drywall photos.  Thats because contractor did upstairs drywall then started mudding.  Then I started spraying primer and he moved downstairs and is doing the drywall and tape/mudding now.


Reminder what we are dealing with in the "old"areas of the house.  Fiber board, with a layer or plaster over it, then a layer of drywall on top of that.  Most of the 30-40% of drywall not redone is like this.  Demo of this stuff sucked.

Master bedroom was new construction in addition, drywall shown.






Master bath here.



Guest bedroom.



Dining and common area